Menu
From geometry to verified installation
A controlled release path for ambitious glass.
Advanced glass succeeds when decisions are released in the right order. OWL TOWER GROUP coordinates the owner, design team, Aestech technical team, engineers, consultants, fabricators, logistics, installers and adjacent trades around visible approvals and field conditions.

Technology partner
Aestech technology with US project delivery coordinated by OWL TOWER GROUP. Engineering, approvals, and professional responsibilities are defined for each project.

Consult + analyze
Define architectural intent, use, exposure, performance, approvals, decision-makers, budget and schedule; then study geometry, loads, movement, support, access, drainage and interfaces.
- Project brief
- Existing information audit
- Constraint and risk map
- Concept options
Engineer + prototype
Develop the glass makeup, connection logic, coordinated details and calculations. Use models, samples, visual mockups, performance mockups and field measurements before final fabrication release.
- Coordinated calculations and details
- Material and finish samples
- Visual and performance mockups
- Release criteria
Fabricate + move + verify
Coordinate production quality, identity, packaging, transport, storage, lifting, installation, protection, seals, drainage, testing, punch and closeout as one field plan.
- Fabrication quality plan
- Logistics and lifting
- First-install witness points
- Testing, punch and records
OWL TOWER GROUP × Aestech
